---
title: "Comment by Bob Fornal on \"A Hired Imposter’s Secrets #6⇒ (My Design Process)\" | Hashnode"
description: "When I am working with clients, I always try to define the MVP (Minimum Viable Product) as detailed as possible. Anything else gets added after the MVP is accom"
url: "https://hashnode.com/posts/a-hired-imposters-secrets-6-my-design-process/626d5a21a2d355d4df43efb2/comment/626d968f454011df6e86bd02"
---

[Discussion](https://hashnode.com/posts/a-hired-imposters-secrets-6-my-design-process/626d5a21a2d355d4df43efb2)

Comment [A Hired Imposter’s Secrets #6⇒ (My Design Process)](https://hashnode.com/posts/a-hired-imposters-secrets-6-my-design-process/626d5a21a2d355d4df43efb2)

[Bob Fornal](https://hashnode.com/@rfornal)

[Apr 30, 2022](https://hashnode.com/posts/a-hired-imposters-secrets-6-my-design-process/626d5a21a2d355d4df43efb2/comment/626d968f454011df6e86bd02)

When I am working with clients, I always try to define the MVP (Minimum Viable Product) as detailed as possible. Anything else gets added after the MVP is accomplished. This way we minimize scope creep.

Also, I tend to be designing from rough wire-framing tools that generally don't match the UI Library so I have to push to make it clear that the wire-frame is not the final view ... we can call it pixel perfect, but there is always variation.

Great article; just adding my thoughts!
