---
title: "Discussion on \"ALM release checklist for Power Platform: what we validate before Prod\" | Hashnode"
description: "Discussion on \"ALM release checklist for Power Platform: what we validate before Prod\". A release that is halfway out the door with a missing dependency is the worst kind of deploy. The 12-item checklist we walk through before every Power Platform production release, with the automation that handles eight of them."
url: "https://hashnode.com/posts/alm-release-checklist-for-power-platform-what-we-validate-before-prod/6a127d85ddd318bf23c3d82c"
---

[Feed](https://hashnode.com/feed) /

Discussion

# [ALM release checklist for Power Platform: what we validate before Prod](https://sapotacorpvn.hashnode.dev/alm-release-checklist-for-power-platform-what-we-validate-before-prod?utm_source=hashnode&utm_medium=feed)

A release that is halfway out the door with a missing dependency is the worst kind of deploy. The 12-item checklist we walk through before every Power Platform production release, with the automation that handles eight of them.

May 24 · 6 min read · sapotacorpvn.hashnode.dev  
Read the article

-   [#power-platform](https://hashnode.com/tag/power-platform)
-   [#alm](https://hashnode.com/tag/alm)
-   [#release-management](https://hashnode.com/tag/release-management)
-   [#devops](https://hashnode.com/tag/devops)
-   [#microsoft](https://hashnode.com/tag/microsoft)

## Written by

[SapotaCorp](https://hashnode.com/@sapotacorpvn)

@sapotacorpvn · Hanoi, Vietnam

  
[View profile](https://hashnode.com/@sapotacorpvn)

## Responses

Markdown supported · ⌘↵ to post

No responses yet.
