---
title: "Discussion on \"Why structural steel fabricators lose margin on change orders\" | Hashnode"
description: "Discussion on \"Why structural steel fabricators lose margin on change orders\". A change order is a formal change to the contract after award. Here is why change orders quietly eat structural steel margin, and how to price and track them."
url: "https://hashnode.com/posts/change-orders-in-structural-steel/6a592910ea40c670d22b112e"
---

[Feed](https://hashnode.com/feed) /

Discussion

# [Why structural steel fabricators lose margin on change orders](https://bidferra.com/blog/change-orders-in-structural-steel?utm_source=hashnode&utm_medium=feed)

A change order is a formal change to the contract after award. Here is why change orders quietly eat structural steel margin, and how to price and track them.

Jul 16 · 10 min read · bidferra.com  
Read the article

-   [#change-orders](https://hashnode.com/tag/change-orders)
-   [#revision-control](https://hashnode.com/tag/revision-control)
-   [#structural-steel-estimating](https://hashnode.com/tag/structural-steel-estimating)
-   [#steel-fabrication](https://hashnode.com/tag/steel-fabrication)
-   [#bid-management](https://hashnode.com/tag/bid-management)
-   [#ai-in-construction](https://hashnode.com/tag/ai-in-construction)

## Written by

[Josh Ford](https://hashnode.com/@joshestimator)

@joshestimator · Toronto, Canada

  
[View profile](https://hashnode.com/@joshestimator)

Developing a real structural steel take off tool.

## Responses

Markdown supported · ⌘↵ to post

No responses yet.
