---
title: "Discussion on \"From Waypoint to Terraform Developer Portal: Designing an Application Upgrade Contract\" | Hashnode"
description: "Discussion on \"From Waypoint to Terraform Developer Portal: Designing an Application Upgrade Contract\". A platform team adds a required deployment-ring input to a shared module. Newly created applications receive the field, while existing applications still carry the previous inputs. An agent preparing"
url: "https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376"
---

[Feed](https://hashnode.com/feed) /

Discussion

# [From Waypoint to Terraform Developer Portal: Designing an Application Upgrade Contract](https://blog.platformpioneer.io/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract?utm_source=hashnode&utm_medium=feed)

A platform team adds a required deployment-ring input to a shared module. Newly created applications receive the field, while existing applications still carry the previous inputs. An agent preparing

1d ago · 12 min read · blog.platformpioneer.io  
Read the article

## Written by

[Darshit Pandya](https://hashnode.com/@platformpioneer)

@platformpioneer · Auckland, New Zealand

  
[View profile](https://hashnode.com/@platformpioneer)

Platform Engineering | Serverless | Thought Leadership

## Responses 2

Markdown supported · ⌘↵ to post

[Rishabh Mishra](https://hashnode.com/@rushdeploy)

[1d ago](https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376/comment/6b07a0fa433321b90088e167)

The migration detail matters most for small teams — existing apps keep the old inputs, so the gate has to reject them explicitly, not just accept the new ones. Logging which ring each app is on would also catch the one app that never got the new field.

[Olivia](https://hashnode.com/@oliviacreates)

[1d ago](https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376/comment/6b079a82590e2c5f9de7a605)

Reproducing the failed upgrade before the successful one is the part I'd steal — proving the gate actually rejects the old contract and the missing input makes the acceptance test mean something, instead of just trusting a green plan.
