---
title: "Comment by Olivia on \"From Waypoint to Terraform Developer Portal: Designing an Application Upgrade Contract\" | Hashnode"
description: "Reproducing the failed upgrade before the successful one is the part I'd steal — proving the gate actually rejects the old contract and the missing input makes"
url: "https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376/comment/6b079a82590e2c5f9de7a605"
---

[Discussion](https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376)

Comment [From Waypoint to Terraform Developer Portal: Designing an Application Upgrade Contract](https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376)

[Olivia](https://hashnode.com/@oliviacreates)

[1d ago](https://hashnode.com/posts/from-waypoint-to-terraform-developer-portal-designing-an-application-upgrade-contract/6b071883d33aa5cdd9202376/comment/6b079a82590e2c5f9de7a605)

Reproducing the failed upgrade before the successful one is the part I'd steal — proving the gate actually rejects the old contract and the missing input makes the acceptance test mean something, instead of just trusting a green plan.
