---
title: "Discussion on \"Major Principles Followed in Work Breakdown Structure (WBS) Estimation\" | Hashnode"
description: "Discussion on \"Major Principles Followed in Work Breakdown Structure (WBS) Estimation\". Work Breakdown Structure (WBS) estimation method follows several major principles to effectively decompose a project into smaller, manageable components. Some of the key principles include:\n\nHierarchical Structure: The WBS follows a hierarchical stru..."
url: "https://hashnode.com/posts/major-principles-followed-in-work-breakdown-structure-wbs-estimation/65e609485ce724316f82cf3d"
---

[Feed](https://hashnode.com/feed) /

Discussion

# [Major Principles Followed in Work Breakdown Structure (WBS) Estimation](https://fahimbinamin.hashnode.dev/major-principles-followed-in-work-breakdown-structure-wbs-estimation?utm_source=hashnode&utm_medium=feed)

Work Breakdown Structure (WBS) estimation method follows several major principles to effectively decompose a project into smaller, manageable components. Some of the key principles include: Hierarchical Structure: The WBS follows a hierarchical stru...

Mar 4, 2024 · 2 min read · fahimbinamin.hashnode.dev  
Read the article

-   [#work-breakdown-structure](https://hashnode.com/tag/work-breakdown-structure)

## Written by

[Md. Fahim Bin Amin](https://hashnode.com/@FahimFBA)

@FahimFBA · Dhaka, Bangladesh

  
[View profile](https://hashnode.com/@FahimFBA)

Microsoft Research Investigation Contributor to OSS (GitHub: FahimFBA) | Software Engineer | Top Contributor 2022, 2023 @freeCodeCamp

Microsoft Research Investigation Contributor to OSS (GitHub: FahimFBA) | Software Engineer | Top Contributor 2022, 2023 @freeCodeCamp | ➡️http://youtube.com/@FahimAmin

## Responses

Markdown supported · ⌘↵ to post

No responses yet.
