---
title: "Comment by Salman Parvez | ML Systems on \"What it took for five coding agents to beat one\" | Hashnode"
description: "The detail I'd put first is the auto-split run that changed two files it was told to leave alone, and its own reviewer still ended on PASS. A crew that inspects"
url: "https://hashnode.com/posts/what-it-took-for-five-coding-agents-to-beat-one/6b0270e6599bb579eea06592/comment/6b041a3e2241e3778e7b6d16"
---

[Discussion](https://hashnode.com/posts/what-it-took-for-five-coding-agents-to-beat-one/6b0270e6599bb579eea06592)

Comment [What it took for five coding agents to beat one](https://hashnode.com/posts/what-it-took-for-five-coding-agents-to-beat-one/6b0270e6599bb579eea06592)

[Salman Parvez | ML Systems](https://hashnode.com/@ml-systems)

[1d ago](https://hashnode.com/posts/what-it-took-for-five-coding-agents-to-beat-one/6b0270e6599bb579eea06592/comment/6b041a3e2241e3778e7b6d16)

The detail I'd put first is the auto-split run that changed two files it was told to leave alone, and its own reviewer still ended on PASS. A crew that inspects its own work signs off on it, which is why the building inspector doesn't work for the framer. Your finding 1 matches how a job gets broken into trades: each sub gets the exact inspection for its scope, and the full walkthrough happens once at the end, not five times by five crews. Six runs per setup against hidden tests is a fair way to measure it, and I appreciate that you separate the two findings with measurements from the three that are observations. Did the frozen plan ever need to change mid-run, and what did you do when it did?

[Nikolay Fokin](https://hashnode.com/@albedolab)

[11h ago](https://hashnode.com/posts/what-it-took-for-five-coding-agents-to-beat-one/6b0270e6599bb579eea06592/comment/6b041a3e2241e3778e7b6d16#reply-6b04f032c3dc0bf7ea59fc85)

Good analogy with the inspector. In the counted runs the plan never changed mid-run: it was frozen with checksums and checked before every run. When something broke during a run, the plan stayed as it was and a repair agent got the failure.

The plan changed once, between the trial and the counted series, when I rewrote the check line, and that became a new freeze. The expensive case was earlier: two parts of a plan contradicted each other, the reviewer refused the work three times before I saw why, and that's why another model now reads the plan before any run.

[Salman Parvez | ML Systems](https://hashnode.com/@ml-systems)

[1h ago](https://hashnode.com/posts/what-it-took-for-five-coding-agents-to-beat-one/6b0270e6599bb579eea06592/comment/6b041a3e2241e3778e7b6d16#reply-6b057c976cc7233007b86011)

Thanks, Nikolay, that answers it. Keeping the plan frozen and sending the failure to a repair agent is the right separation. Once the plan can move mid-run, nobody can say afterward what the work was checked against. The contradiction case is the one I'd remember. Three refusals from the reviewer was the reviewer doing its job, and the fault was in the drawings. Having another model read the plan before any run is plan review before the permit.
