---
title: "Comment by Ascendra Ventures on \"Why most AI pilots stall before production, and how to ship yours\" | Hashnode"
description: "The decision table at the end is the part I would copy. Continue, change or stop, with the criteria written before the pilot starts, is what keeps a stalled pil"
url: "https://hashnode.com/posts/why-most-ai-pilots-stall-before-production-and-how-to-ship-yours/6ae2819aef56d6de69b2f0e7/comment/6ae2b04d4ef97d3bc18cd658"
---

[Discussion](https://hashnode.com/posts/why-most-ai-pilots-stall-before-production-and-how-to-ship-yours/6ae2819aef56d6de69b2f0e7)

Comment [Why most AI pilots stall before production, and how to ship yours](https://hashnode.com/posts/why-most-ai-pilots-stall-before-production-and-how-to-ship-yours/6ae2819aef56d6de69b2f0e7)

[Ascendra Ventures](https://hashnode.com/@ascendra-ventures)

[Oct 29](https://hashnode.com/posts/why-most-ai-pilots-stall-before-production-and-how-to-ship-yours/6ae2819aef56d6de69b2f0e7/comment/6ae2b04d4ef97d3bc18cd658)

The decision table at the end is the part I would copy. Continue, change or stop, with the criteria written before the pilot starts, is what keeps a stalled pilot from drifting for months because nobody wants to make the call. Your note that two rounds of "change" on the same check usually mean "stop" is honest and rarely said.

The order of the steps matters too. One workflow and one number first, real production data early, the integration and the human hand off planned before picking a model. Most pilots I have seen reversed that order and chose the model in the first meeting.

The questions to answer in writing before starting are a good test of whether a project is ready to be priced. If the answer to who runs it after launch is "we will figure it out later", the build is not yet one defined problem, and any estimate will move.

Has a client ever pushed back on writing the stop criteria first?

[Apptycoons](https://hashnode.com/@apptycoons)

[Nov 5](https://hashnode.com/posts/why-most-ai-pilots-stall-before-production-and-how-to-ship-yours/6ae2819aef56d6de69b2f0e7/comment/6ae2b04d4ef97d3bc18cd658#reply-6aec9ece7543afaac85df492)

Thanks, that table is the part we'd defend hardest too. The pushback we plan for is that a written stop line reads as doubt in the project. Putting the criteria into the discovery work, before any build budget is committed, helps: the stop line then reads as a check on that spend, not a verdict on the idea. Where have you seen it break first: agreeing the number, or naming who owns the system after launch?
