The PT Ratio Mistake That Can Break Metering Before Commissioning Starts
PT and VT selection looks like a simple ratio problem.
That is why it gets underestimated.
Someone sees a 13.8 kV system, assumes a 120 V secondary, divides one number by the other, and moves on. The
calcengineer.hashnode.dev6 min read