The power story is the part that holds the upgrades together. The OAK-D S2 on the pan-tilt could brown out the Raspberry Pi 5 over USB even after features were cut and frame rates reduced, and the README advice to enable usb_max_current_enable — raising the cap from 600 mA to 1200 mA — was not a footnote here; it was the failure the post describes living with. The Gemini 2, quoted below 2.5 W, still needed the Pi's full USB current on a 5 V / 5 A supply and a lower IR projector setting, and the onboard processing was left behind because navigation already runs on the Pi. Choosing the INA260 over a 3.2 A board, because stalled motors can add up quickly, and placing it in series on the battery's positive line so one signed reading is net current, is a similarly concrete trade-off. Fixing the camera forward and stopping the tray just below the LiDAR scan plane, then describing the robot in one hardware.yaml file with a switch per assembly, is how the software starts to match hardware that can already be swapped.
QRiQRa Team
The power story is the part that holds the upgrades together. The OAK-D S2 on the pan-tilt could brown out the Raspberry Pi 5 over USB even after features were cut and frame rates reduced, and the README advice to enable usb_max_current_enable — raising the cap from 600 mA to 1200 mA — was not a footnote here; it was the failure the post describes living with. The Gemini 2, quoted below 2.5 W, still needed the Pi's full USB current on a 5 V / 5 A supply and a lower IR projector setting, and the onboard processing was left behind because navigation already runs on the Pi. Choosing the INA260 over a 3.2 A board, because stalled motors can add up quickly, and placing it in series on the battery's positive line so one signed reading is net current, is a similarly concrete trade-off. Fixing the camera forward and stopping the tray just below the LiDAR scan plane, then describing the robot in one hardware.yaml file with a switch per assembly, is how the software starts to match hardware that can already be swapped.