"Saved has to mean pushed" is the lesson I'd frame. A status that reports the local step and not the outcome is how a problem runs for two days with nobody knowing. I come from construction estimating, and the "of 57" heading is a familiar trap: stamp a running total on every sheet and every sheet gets reissued when one line changes. Number the item once and keep the total on a cover page. Good on you for retiring the milliseconds claim after measuring 47 seconds, too. Every figure coming from a script anyone can run is the right standard.