Validation loss bottoming at step 100 (1.382) and climbing to 1.811 by step 300 is the overfitting I keep forgetting to watch for. You kept the step-100 checkpoint; I once shipped a later one because training loss was still falling while the held-out set had already turned. Did you settle on 300 total steps by watching that curve, or was it a budget set up front?