The detail I'd put first is the auto-split run that changed two files it was told to leave alone, and its own reviewer still ended on PASS. A crew that inspects its own work signs off on it, which is why the building inspector doesn't work for the framer. Your finding 1 matches how a job gets broken into trades: each sub gets the exact inspection for its scope, and the full walkthrough happens once at the end, not five times by five crews. Six runs per setup against hidden tests is a fair way to measure it, and I appreciate that you separate the two findings with measurements from the three that are observations. Did the frozen plan ever need to change mid-run, and what did you do when it did?