“Which failure does it prevent?” is a great test, and I’d add a second: does it still fit? Honestly, no single check from that deploy mattered most. What matters is not treating the process as finished. We watch for friction all the time and talk about it every sprint, not just at the end of a project. What fits a team one year might not fit it the next. Teams grow, shrink and change; systems change under them. A check that prevented a real failure last year can be pure red tape now, and a gap you could live with at five people can sink you at fifteen. That’s what retros are for, and not only the team’s output: the process around the team too. What went well, what could be better, which step is the bottleneck now, what can be automated so nobody has to remember it. Try something for a sprint or two, then keep it, tweak it, or go back. Change is the only constant, so the process has to change with it.
